New Wanaka Office , Logic Group, Wanaka Office

Logic Group are proud to announce that we have opened a new office in Wanaka.  We are at 50 Cardrona Valley Road…if you are in the area – please pop in and say hello! Perfect view….

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The University of Otago (UOO) Hayward College Refurbishment project reached the milestone of achieving practical completion at 5.00pm on Friday 15th February 2019 – exactly on schedule. Simon Dalton, UOO Senior Property Manager is pictured with Sam Cadden from Logic Group.

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

It was ‘Contractor Clean Up Day’ on Friday at the Hayward site. After 12 weeks of working up to 14 hours a day, haircuts have been at the bottom of our Contractors priorities.. So….’If the mountain will not come to Muhammad, then Muhammad must go to the mountain’!! Please use the link below to read[…]

Read More

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The fourth, third and second floor bedrooms of Hayward College now have furniture in them, thanks to the hard work of all Contractors on site. The project is on schedule, and the last two weeks are going to continue to be as fast paced as the last ten!

Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The internal fit-out of Maniototo Hospital is on its final days of completion. Over the next few weeks the services will be commissioned,  furniture installed and landscaping completed.

Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The new $7.0m Maniototo Hospital is scheduled to be completed in time for its mid-February audit. Logic have been the Project Managers on the facility from its inception.  The facility will have 26 rooms comprising of rest-home residents and hospital patients. http://www.thenews.co.nz/community/new-hospital-progress-is-right-on-schedule/

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The first Hayward College refurbishment project toolbox talk for 2019 took place outside in the brilliant Dunedin sunshine. Between 120-140 people are on site everyday to ensure this project is handed over to the University of Otago in time for the students arrival.

Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The Maniototo Hospital new build is progressing well, with painting and floor coverings underway in the main Hospital. The access road is being prepared for asphalting and the Boiler House, Wood Chip Bunker and related services are well underway.

Otago Polytechnic , Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Otago Polytechnic celebrated the opening of its $1.5m redevelopment of its Bannockburn site this week. Students will start using the new facilities in early 2019. This new Trades and Brewery building is the second stage of a two-stage, $3.0m project at the Central Campus.  A $1.5m student accommodation complex opened earlier this year. Click here[…]

Read More

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Logic Group were recently awarded the Project Management for the Hayward College Refurbishment project in Dunedin. This project involves: • Remove earthquake-prone hollow tile brick partition walls. • Structural Strengthening of other walls and new lift shaft/stairwell structural ties. • Passive fire ratings to achieve a minimum of 60 minute throughout. • Alterations to create[…]

Read More

Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The roof, and windows are now in place, with work approximately 1 week ahead of schedule. Currently the sub-trades are well into the first fix. The doors have arrived, and are being installed.

Dunedin City Council, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

External condition surveys were undertaken this week for the Dunedin City Council.  Heritage Architects, Structural Engineers and a Stonemason consultant were lifted over and around the Dunedin Town Hall and Municipal chambers assessing the building structure. Reports are due soon.  

Property Council Awards, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

We had a fantastic night at the Property Council New Zealand Rider Levett Bucknall Property Council Industry Awards 2018 on Friday, with the Otago Polytechnic Student Village project receiving two awards. Excellence, Resene Green Building Property Award Merit, Arrow International Multi-Unit Residential Property Award Well done team!

Otago Polytechnic Central Otago Campus, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The slab pour occurred this week for the new Central Campus development at the Bannockburn Road site. Prior to this, the site was blessed by Francie Diver of Alexandra.

Mercy Hospital Car Park, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The successful drilling of the new stormwater pipe route under Marinoto Clinic and the pouring of the Grid C concrete beam have been recently completed. Our attention now turns to the installation of the concrete beams and flat slabs. The car park is on track to be completed late July 2018.

Otago Polytechnic Student Village, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Sam Cadden was given the opportunity to address the invited guests on Friday 1st June at the official opening of the Otago Polytechnic Student Village. He reported on the building and design features, outlining the sustainable impact of the building. Congratulations Otago Polytechnic for this iconic prototype building.