Fibre reinforcement and grout jacketing of the existing capping beam structure being implemented to minimise any invasive works to heritage fabric on going.
Trinity Church and Shands
By Logicgroup Business Nov 01, 2016
Otago Polytechnic Student Village
By Logicgroup Business Oct 29, 2016
A drill rig began working in Dunedin on Friday 28th October on a circa $20 million project, of which Logic is Project Manager, to build an accommodation complex to house Otago Polytechnic students. Read more here : https://www.odt.co.nz/news/dunedin/20m-student-housing-complex-work-starts
ANZ Centre
By Logicgroup Business Oct 25, 2016
Cashel Street retail designs completed and shop fit out commenced in Oct for a Nov trade date.
Trinity Church and Shands
By Logicgroup Business Sep 22, 2016
Roof diaphragm works completed allowing a complete investigation of the roof structure to be carried resulting in a design change to proposed capping beams Oct.
Cancer Ball
By Logicgroup Business Sep 18, 2016
Logic Group attended the Otago Polytechnic Cancer Society Spring Ball held at the Dunedin Town Hall. We were proud to attend such a wonderful event.
ANZ Centre
By Logicgroup Business Sep 16, 2016
Corporate tenant fit out designs completed and coordinated base build and tenant fit out under way ready for Feb 2017 completion.
Ministry of Education
By Logicgroup Business, Client Jun 15, 2016
We were recently appointed on 3 panels for the Ministry of Education – the 10 Year Property Panel, PM Minor and PM Major Panels. Logic are very proud to continue our partnership with the Ministry of Education.
ANZ Centre
By Logicgroup Business, Client Apr 18, 2016
The ANZ Building achieved the critical design mass allowing the base isolators to be unlocked and operative while the ground anchors were tensioned up. This then allowed the dewatering pumps to be turned off and removed. This concluded the in ground and civils seismic works.
Trinity Church and Shands
By Logicgroup Business Apr 12, 2016
URM rubble core fully resin injected and building stabilised allowing damaged interior reinforced concrete skin to be removed.