It was full steam ahead last Friday (25th November) with ground stabilisation and foundation preparation well underway for the 231-room Otago Polytechnic new student accommodation building.
The foundations are scheduled to be poured mid-December closely followed by the arrival on site of the CLT (cross laminated timber) panels on the 16th January 2017.
Leave a comment