Browsing tag:

Project Management


Otago Polytechnic, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Work continues on finishing the O Block extension ahead of the planned completion date next month. Window joinery and glazing installation is continuing – along the ground floor corridor it should be brighter and more pleasant with glazing going in meaning some of the construction hoardings were been removed.

Otago Polytechnic, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Work continues to go well at Otago Polytechnic.  The milestone of completing the roof on the second wing of the new O Block extension is in sight, with the new roofing iron on the main roof section now complete. Wall framing will continue along the last structural steel installation in the coming week.

Clearwater Apartments, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Construction has commenced on Clearwater Apartments, a boutique luxury apartment development. Logic Group are working closely with Marty Verry, (Redstag), under a construction management contract. The construction methodology is off to an innovative start – instead of the usual dewatering of the site, we lowered the lake 🙂

Otago Polytechnic Central Otago Campus, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Great to see the progress at the Cromwell Otago Polytechnic Campus.    With the handover this Wednesday – that leaves time to move in equipment before the start of the school year. Please use the link below to read the full story in the Otago Daily Times. https://www.odt.co.nz/regions/central-otago/polytech%E2%80%99s-12m-glasshouse-almost-ready

Knox College, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The project is on track at Knox College this week – Wilson bedroom joinery is being installed to the first of 4 houses and vinyl laying in the bathrooms; Glendining masked and sealed for paint before 25th December; Marshall above grid services QA completed and gib ceiling boards going up; Mackay door install, blocking and[…]

Read More

Southern Excellence Awards, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Well done to the 57 or so contractors responsible for the speedy refurbishment of the University of Otago’s Hayward College have gained the best team award at this year’s Property Council New Zealand southern excellence awards, held in Christchurch. https://www.odt.co.nz/business/hayward-contractors-win-southern-excellence-award

Knox College, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Logic Group are proud to begin a project at Knox College.  Knox College, founded by the Presbyterian Church in 1909, is one of New Zealand’s oldest and best-known residential colleges The project, consists of a fire safety upgrade and refurbishment of 71 bedrooms, alterations to all common rooms and kitchenettes with the addition of extra[…]

Read More

Ashburton Council, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Logic Group are proud to be the Project Managers on the new $51.6m library and civic centre in Ashburton.   This new building will incorporate a Heritage building. $3.0m has been allocated by the Ashburton District Council for additional sustainability design elements. https://www.stuff.co.nz/the-press/news/mid-canterbury-selwyn/115073401/new-civic-centre-library-approved-for-ashburton

New Wanaka Office , Logic Group, Wanaka Office

Logic Group are proud to announce that we have opened a new office in Wanaka.  We are at 50 Cardrona Valley Road…if you are in the area – please pop in and say hello! Perfect view….

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The University of Otago (UOO) Hayward College Refurbishment project reached the milestone of achieving practical completion at 5.00pm on Friday 15th February 2019 – exactly on schedule. Simon Dalton, UOO Senior Property Manager is pictured with Sam Cadden from Logic Group.

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

It was ‘Contractor Clean Up Day’ on Friday at the Hayward site. After 12 weeks of working up to 14 hours a day, haircuts have been at the bottom of our Contractors priorities.. So….’If the mountain will not come to Muhammad, then Muhammad must go to the mountain’!! Please use the link below to read[…]

Read More

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The fourth, third and second floor bedrooms of Hayward College now have furniture in them, thanks to the hard work of all Contractors on site. The project is on schedule, and the last two weeks are going to continue to be as fast paced as the last ten!