Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The new $7.0m Maniototo Hospital is scheduled to be completed in time for its mid-February audit. Logic have been the Project Managers on the facility from its inception.  The facility will have 26 rooms comprising of rest-home residents and hospital patients. http://www.thenews.co.nz/community/new-hospital-progress-is-right-on-schedule/

Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The Maniototo Hospital new build is progressing well, with painting and floor coverings underway in the main Hospital. The access road is being prepared for asphalting and the Boiler House, Wood Chip Bunker and related services are well underway.

Maniototo Hospital, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The roof, and windows are now in place, with work approximately 1 week ahead of schedule. Currently the sub-trades are well into the first fix. The doors have arrived, and are being installed.

Mercy Hospital Car Park, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The Mercy Hospital Car park was completed and handed over on 10th August 2018. On Saturday 11 August, at 9.30am, it was officially opened with a walk-in preview and blessing.

Crane Lift, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The 5 tonne MRI machine was lifted out of level 1 of the Clinical Services Building on Saturday 12th November.   The waiting room, triage and reception of the Emergency Department were temporarily evacuated while the lift took place.  The replacement MRI is due to be lifted into the same space in the next week.