Browsing tag:

clients


Otago Polytechnic, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Work continues to go well at Otago Polytechnic.  The milestone of completing the roof on the second wing of the new O Block extension is in sight, with the new roofing iron on the main roof section now complete. Wall framing will continue along the last structural steel installation in the coming week.

Knox College, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The project is on track at Knox College this week – Wilson bedroom joinery is being installed to the first of 4 houses and vinyl laying in the bathrooms; Glendining masked and sealed for paint before 25th December; Marshall above grid services QA completed and gib ceiling boards going up; Mackay door install, blocking and[…]

Read More

Southern Excellence Awards, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Well done to the 57 or so contractors responsible for the speedy refurbishment of the University of Otago’s Hayward College have gained the best team award at this year’s Property Council New Zealand southern excellence awards, held in Christchurch. https://www.odt.co.nz/business/hayward-contractors-win-southern-excellence-award

Knox College, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Logic Group are proud to begin a project at Knox College.  Knox College, founded by the Presbyterian Church in 1909, is one of New Zealand’s oldest and best-known residential colleges The project, consists of a fire safety upgrade and refurbishment of 71 bedrooms, alterations to all common rooms and kitchenettes with the addition of extra[…]

Read More

Ashburton Council, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Logic Group are proud to be the Project Managers on the new $51.6m library and civic centre in Ashburton.   This new building will incorporate a Heritage building. $3.0m has been allocated by the Ashburton District Council for additional sustainability design elements. https://www.stuff.co.nz/the-press/news/mid-canterbury-selwyn/115073401/new-civic-centre-library-approved-for-ashburton

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The University of Otago (UOO) Hayward College Refurbishment project reached the milestone of achieving practical completion at 5.00pm on Friday 15th February 2019 – exactly on schedule. Simon Dalton, UOO Senior Property Manager is pictured with Sam Cadden from Logic Group.

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

It was ‘Contractor Clean Up Day’ on Friday at the Hayward site. After 12 weeks of working up to 14 hours a day, haircuts have been at the bottom of our Contractors priorities.. So….’If the mountain will not come to Muhammad, then Muhammad must go to the mountain’!! Please use the link below to read[…]

Read More

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The fourth, third and second floor bedrooms of Hayward College now have furniture in them, thanks to the hard work of all Contractors on site. The project is on schedule, and the last two weeks are going to continue to be as fast paced as the last ten!

Hayward College, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The first Hayward College refurbishment project toolbox talk for 2019 took place outside in the brilliant Dunedin sunshine. Between 120-140 people are on site everyday to ensure this project is handed over to the University of Otago in time for the students arrival.

Property Council Golf Day, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Great day had by all at the recent golf day! Logic Group entered a team and sponsored a hole for the Property Council Annual Golf Day which was held at Otago Golf Club last Friday. This team – Sam Thornburn, Cameron Olsen, Rosie Clark and Nick Thornburn got right into the spirit of the day.[…]

Read More

Fire and Emergency NZ, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Today we received confirmation that we were awarded full FM Services of the National Training Centre in Rotorua. The training centre is sited on a 2-hectare site with some key site features being: An administration building. Fire simulation structures (retail shops, hotel, residential dwellings etc). Simulation areas (service station, motor vehicle crash, train and tunnel[…]

Read More

Otago Polytechnic Student Village, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The polystyrene insulation sheets and steel reinforcing are being secured into place today ahead of the first foundation pour.    It is envisaged that the pour will go ahead tomorrow. Next week will be a busy one on site as the CLT panels will be delivered from Monday onwards.