The roof, and windows are now in place, with work approximately 1 week ahead of schedule. Currently the sub-trades are well into the first fix. The doors have arrived, and are being installed.

Mercy Hospital Car Park, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The Mercy Hospital Car park was completed and handed over on 10th August 2018. On Saturday 11 August, at 9.30am, it was officially opened with a walk-in preview and blessing.

Mercy Hospital Car Park, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The successful drilling of the new stormwater pipe route under Marinoto Clinic and the pouring of the Grid C concrete beam have been recently completed. Our attention now turns to the installation of the concrete beams and flat slabs. The car park is on track to be completed late July 2018.

The rain over the last few days has turned the Mercy Hospital Car Park site into a lake! It took three pumps working flat out to get rid of excess water so they could carry on with the construction.

Mercy Hospital Car Park, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

Good progress is being made on the new Mercy Hospital car park.   There will be 96 car parks once the development has been completed. The majority of the excavation is now complete and the installation of the under-slab stormwater pipework has progressed. This project has a completion date of 31st July 2018.

Crane Lift, Logic Group, Level 4, Forsyth Barr House, 165 Stuart Street Dunedin 9058

The 5 tonne MRI machine was lifted out of level 1 of the Clinical Services Building on Saturday 12th November.   The waiting room, triage and reception of the Emergency Department were temporarily evacuated while the lift took place.  The replacement MRI is due to be lifted into the same space in the next week.